Lightweight Composite Solutions for the Spartan SCOUT
PIs: Chad Ulven (PI), Alan Kallmeyer (Co-PI), Ghodrat Karami (Co-PI)
Sponsor: SpaceAge Synthetics, Inc./US Navy
Funding: $225,281
Duration: September 2007 – December 2008
Development of a Nonlinear Cumulative Fatigue Damage Methodology for Aircraft Engine Components under Multiaxial
PIs: Alan Kallmeyer (PI)
Sponsor: Air Force Office of Scientific Research
Funding: $307,856
Duration: April 2007 – November 2009
Evaluation of Multiaxial Fatigue Parameters for Aircraft Engine Materials
PIs: Alan Kallmeyer (PI)
Sponsor: General Electric Aviation (Aircraft Engine Division)
Funding: $180,000 (total amount awarded through annual renewals)
Duration: June 2003 – December 2007
Application of Cumulative Damage Theories to Multiaxial Loadings
PIs: Alan Kallmeyer (PI)
Sponsor: Aerospace Testing Alliance/Sverdrup Technology, Arnold Engineering Development Center, Arnold Air Force Base
Funding: $118,000 (total amount awarded through annual renewals)
Duration: May 2003 – September 2007
Hydrogen Conversion of an Agricultural Row Crop Tractor
PIs: Alan Kallmeyer (PI), Robert Pieri (Co-PI), Mike Stewart (Co-PI), Vern Hofman (Co-PI)
Sponsor: Basin Electric Power Cooperative
Funding: $20,000
Duration: June 2006 – December 2007
Testing of Thermoplastic Composite Material Concepts for Military Equipment Transportation Container Design
PIs: Chad Ulven (PI), Jing Shi (Co-PI), Mohammad Mahinfalah (Co-PI), Alan Kallmeyer (Co-PI), Reuben Tschritter (Co-PI)
Sponsor: Sioux Manufacturing
Funding: $10,000
Duration: April 2006 – August 2006
Development of Fatigue Damage Assessment Methods Considering LCF/HCF Interactions
PIs: Alan Kallmeyer (PI), Peter Kurath (Co-PI)
Sponsor: Air Force Research Laboratory
Funding: $84,000
Duration: February 2004 – February 2006
Alternative Aerial Target Launcher, Rotational Energy Concept: Final Design
PIs: Alan Kallmeyer (PI), Jack Johnson (Co-PI)
Sponsor: Analytical Services, Inc.
Funding: $35,000
Duration: July 2004 – December 2004
Fatigue Behavior of Microcrack Resistant Composite Materials
PIs: Frank Yazdani (PI), Alan Kallmeyer (Co-PI)
Sponsor: Composite Technology Development, Inc.
Funding: $6,000
Duration: June 2004 – September 2004
Advanced Chemical Iodine Lasers
PIs: Frank Yazdani (PI), Alan Kallmeyer (Co-PI)
Sponsor: Composite Technology Development, Inc.
Funding: $21,000
Duration: September 2003 – June 2004
Target Launcher Design and Coating Study
PIs: Jack Johnson (PI), Alan Kallmeyer (Co-PI)
Sponsor: Applied Resources, Inc.
Funding: $42,000
Duration: August 2003 – May 2004
Target Launcher Study, Phase I: Development of Rotational Energy System
PIs: Jack Johnson (PI), Alan Kallmeyer (Co-PI), David Wells, (Co-PI)
Sponsor: Applied Resources, Inc.
Funding: $49,000
Duration: August 2003 – June 2004
Durability of Graphite Fiber Composites Subjected to Reduced Temperature Thermal Fatigue
PIs: Ken Kellogg (PI), Alan Kallmeyer (Co-PI)
Sponsor: Army Research Office
Funding: $193,000 ($289,000 project total)
Duration: June 2000 – June 2004
Multiaxial Fatigue Life Prediction Methodologies for Advanced Metallic Materials
PIs: Alan Kallmeyer (PI)
Sponsor: University of Dayton Research Institute/Air Force Office of Scientific Research
Funding: $151,000 (total amount awarded through annual renewals)
Duration: June 1999 – August 2003
Affordable Processing and Dynamic Characterization of Sandwich Composite Structures
PIs: Uday Vaidya (PI), Alan Kallmeyer (Co-PI), Mohammad Mahinfalah (Co-PI), Ken Kellogg (Co-PI)
Sponsor: National Science Foundation
Funding: $203,000
Duration: January 2001 – November 2003
Acquisition of High-Rate Loading and Damage Characterization Equipment for Advanced Materials Research and Education
PIs: Alan Kallmeyer (PI), Ken Kellogg (Co-PI), Robert Pieri (Co-PI), Mohammad Alimi (Co-PI)
Sponsor: National Science Foundation
Funding: $82,000
Duration: June 2002
Acquisition of Instrumented High/Low Velocity Impact Test System for Advanced Materials Research and Education
PIs: Alan Kallmeyer (PI), Ken Kellogg (Co-PI), Mohammad Alimi (Co-PI)
Sponsor: ND EPSCoR Infrastructure Improvement Program
Funding: $84,000
Duration: June 2002
|