Description:

Plans for the Engineering Center were formulated shortly after World War II. Plans became finalized in 1955 with the completion of Dolve Hall, but did not become a reality until 1963 when ground-breaking for the Center took place. The project involved the construction of a circular administration building, a one-story addition to the front of Dolve Hall, and three additional buildings to house: Civil and Industrial Engineering, Electronics and Electrical Engineering, Mechanical Engineering and Architecture. The plans also called for connecting the buildings with covered skywalks. By the fall of 1965, the Center was complete (at a cost of $1.4 million) and all five engineering buildings were linked together by uncovered skywalks (Spectrum, 1965, p. 9). The new facility housed sixty-five faculty members; twenty-five secretaries and technicians; and approximately 1000 students enrolled in Engineering and Architecture.

Address:

Albrecht Blvd at Centennial Blvd
Fargo, ND, 58105

Directions:

Online directions and map for Engineering Center
(Google)

Highlighted Printable Campus Map (PDF):

Detailed Campus Map with Highlighted Engineering Center
(Printable PDF)

List of offices and/or departments
located in Engineering Center:


Site Manager: NDSU WebMaster
Last Updated: Monday July 21 2008, 12:10:09
Published by North Dakota State University
North Dakota State University
Information Phone: (701) 231-8011
Physical Address: 1301 12th Avenue North, Fargo, ND 58102
Mailing Address: PO Box 6050, Fargo, ND 58108-6050