Content | Navigation |

Construction, Renovation and Projects


The Facilities Management Planning and Construction Services Group provides all construction services from architect selection, programming, design development, construction documents, code review, bidding, contract award, and project management for the Capital Projects on the NDSU Campus.  As part of the project management services we have the responsibility for compliance with North Dakota Century Code, SBHE and NDSU policies as well as management of the project budget.  We also have developed and are constantly updating the NDSU Campus Design Standards which help ensure our facilities are constructed to high quality standards.  We are also responsible for assisting NDSU Departments with remodeling and renovations to existing facilities.  Our team of project managers can assist you with the development of a project to meet your needs.  We will also provide a detailed estimate; manage the process from start to finish, and work to ensure the process is seamless and as non-disruptive as it can be.   Our group assists in long term Campus Master Planning and can assist departments with their planning efforts.  We also maintain the campus building inventory and space database, campus maps, and utility infrastructure drawing and are responsible for campus signage and way finding.  We look forward to working with you.

Current RFQ's

  • None at this time

To receive copies of the full RFQ please contact Cheryl Cicha at 701-231-7912 or cheryl.cicha@ndsu.edu.

Current Projects

Parking/Roads
WE Lot     Re-opening this Fall
R Lot                  Re-opening this Fall
Buildings
Ag Service Center The Ag Service Center is getting an interior upgrade including lighting, overhead doors, paint, and refreshing other interior finishes.
Barry Hall
Coffee Shop – The coffee shop in Barry Hall will be open for Fall Semester and includes a more private seating area and increased seating area for students to study and relax between classes.
Bentson Bunker FieldhouseReplace South Steps – The main south stairs at Bentson Bunker Fieldhouse are being repaired to maintain a safe entrance and exit for events in the Fieldhouse. 
Upgrade Mechanical & Electrical – Air Conditioning by means of ice storage has been added to the Fieldhouse.
Ceres Tuck-pointing – To maintain the exterior of the building, tuck-pointing and exterior brick work is continuing on Ceres.
ChurchillChurchill is undergoing a major renovation that spans for two years.  Phase 1 will be completed in the fall of 2016 which includes adding drain tile and waterproofing to the perimeter and adding egress windows for the lower level.  Phase 2 will be completed by Fall 2017 and will include an interior renovation to the entire building.
Dolve Dolve and the other engineering buildings received an interiors refresh this summer which includes improved hallway finishes and an update to six labs within the complex.
EMLVentilation Improvements – EML is under renovation to add cooling to the third level and refresh the interior finishes.  This project is scheduled to be completed by Spring Semester 2017.
Sanford Health Athletic Complexformerly known as Bison Sports Arena

Brian Windingland
Associate Director

Phone: (701) 231-7311
Fax: (701) 231-8008
brian.windingland@ndsu.edu

 

For further information on current and/or past projects, please contact us.


Student Focused. Land Grant. Research University.

Follow NDSU
  • Facebook
  • Twitter
  • RSS
  • Google Maps

North Dakota State University
Phone: +1 (701) 231-7911 / Fax: (701) 231-8008
Campus address: Thorson Maintenance Center 100
Physical/delivery address: 1310 Bolley Drive, Fargo, ND 58102
Mailing address: NDSU Dept. 3200 / PO Box 6050 / Fargo, ND 58108-6050
Page manager: Facilities Management

Last Updated: Friday, August 19, 2016 11:28:20 AM